Long Upgrade Kit banana posts shielded 12-15/16 leads IEC color coded for pageWriter TC 70. Consisting of 4 additional long lead assy (48" (1.22m)), 6 shorting plugs, 2 lead separators 3.4 diameter, 4 banana post adapters, 6 colored rings, 4 white base rings and instructions for use. The long additions lead sets come pre-assembled with the white base ring and the banana post adapters. 1 kit = 1 sales unit.
| Patient Application | 
 | 
|---|---|
| Application Site | 
 | 
| Lead Set Length | 
 | 
| Number of Leads | 
 | 
| Shielded | 
 | 
| Electrode Attachment Method | 
 | 
| Color Coding | 
 | 
| Product Category | 
 | 
|---|---|
| Use with Non-Philips Healthcare Equipment | 
 | 
| Use with Philips Healthcare Equipment | 
 | 
| Product Type | 
 | 
| Single-Patient Use OR Multi-Patient Use | 
 | 
| CE Certified | 
 | 
| Not manufactured with natural rubber latex | 
 | 
| Packaging Unit | 
 | 
| Minimum Shelf Life | 
 | 
| Sterile OR Non-Sterile | 
 | 
| Use with Other Supplies | 
 | 
| Patient Application | 
 | 
|---|---|
| Application Site | 
 | 
| Product Category | 
 | 
|---|---|
| Use with Non-Philips Healthcare Equipment | 
 | 
| Patient Application | 
 | 
|---|---|
| Application Site | 
 | 
| Lead Set Length | 
 | 
| Number of Leads | 
 | 
| Shielded | 
 | 
| Electrode Attachment Method | 
 | 
| Color Coding | 
 | 
| Product Category | 
 | 
|---|---|
| Use with Non-Philips Healthcare Equipment | 
 | 
| Use with Philips Healthcare Equipment | 
 | 
| Product Type | 
 | 
| Single-Patient Use OR Multi-Patient Use | 
 | 
| CE Certified | 
 | 
| Not manufactured with natural rubber latex | 
 | 
| Packaging Unit | 
 | 
| Minimum Shelf Life | 
 | 
| Sterile OR Non-Sterile | 
 | 
| Use with Other Supplies | 
 | 
You are about to visit a Philips global content page
Continue